Dossier · Reversibility audit

Decide on a residual dependency

Qualify what still requires the source after the test, then have the competent authority choose whether to accept, reduce or replace it.

On this page
Decision rule

Do not let an average compensate for a critical impossibility

A residual dependency is an asset, right, service or item of know-how still required from the source after recovery. Each is examined separately: a favourable overall score cannot erase an active account, a missing right or a critical function that was not restored.

Qualification

Describe the effect before choosing treatment

The decision rests on observations attached to the tested scenario, not on an abstract view of the supplier.

  • Affected function — blocked or degraded business journey
  • Break condition — shutdown, contract end, change or unavailability
  • Extent — affected users, data, regions and interfaces
  • Tolerable delay — point at which the effect becomes unacceptable
  • Substitute — actually qualified target and mobilisation time
  • Evidence — test observation supporting the conclusion
Accept

Make acceptance a bounded decision

The authority may accept a dependency when it understands the plausible effect, treatment cost, monitoring conditions and the point at which the decision must be revisited. Acceptance names an owner and is never implicit.

Reduce

Choose a measure that changes exit capability

Every treatment must alter an observation from the test and schedule a new verification.

Treatments and closure evidence
TreatmentIntended effectClosure evidence
Terms and assistanceObtain missing assets, time or cooperationSigned contract and executed exercise
ArchitectureIsolate or replace a captive componentReplayed deployment and journeys
Second sourceReduce a single point of failureTested switch to the target
SkillsRemove an indispensable source interventionOperation performed by target team
MonitoringDetect before capability is lostExercised threshold, alert and decision
Replace

Trigger exit when the residual remains incompatible with the service

Replacement becomes supportable when the dependency blocks a critical function, exceeds the tolerable delay or cannot be reduced under accepted conditions. The decision identifies the target, window, prerequisites and switching authority.

The previous test becomes the exit-plan baseline. Reservations do not disappear: they become migration entry conditions.

Decision register

Connect every residual to an authority and future evidence

The register makes clear who decided, on which facts and until which date.

  • Identifier — dependency and version concerned
  • Observation — test phase and evidence
  • Decision — accept, reduce or replace
  • Authority — person empowered to own the risk
  • Deadline — treatment or reassessment date
  • Closure — test to replay and expected result
Reassessment

Reopen the decision when the system or context changes

A material change of model, platform, contract, region, team or critical function can make the previous exercise obsolete. An incident or change in exit rights also triggers reassessment.

Primary sources

Sources this page relies on

Last documentary review: 6 September 2026.

Before you write to us

Frequently asked questions

Can a critical supplier dependency be accepted?

Yes, when the competent authority understands the effect, alternatives, monitoring conditions and duration of acceptance. The decision must be explicit, assigned and dated.

Why not calculate one reversibility score?

Because an average can hide a critical impossibility. Every blocking asset, right, function and skill must be decided separately before the overall conclusion.

When should the test be repeated?

After a material change in platform, model, contract, region, team or critical function, and after an incident or change in exit rights.

Reversibility dossier

Which dependency still lacks a decision authority?

Present the residual and the function it affects. We assess whether the facts support an explicit decision.

Scope the decision